Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how much binding wire is required for one tone steel

Answer Posted / pradip kr deb

According to me its should be 5 kg to 6 kg binding wire is required for one tone reinforcement.

Is This Answer Correct ?    11 Yes 17 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate quantity of bricks in circular manhole with examples.

5780


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

2322


How to take labor charges for construction of 1cum of concrete?

1231


States some of the tool bars used in cad?

1271


Formula for calculating the volume of bulb in underreamed pile

5072


For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?

2026


what is anchorage length,lap length and (dont remember the last one)

2257


PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg

2396


Ratio for 4500 psi concrete

1698


what is labour consume factor in residential projects

2432


50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?

2010


Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.

3526


what will happen if one could not properly follow the spacing of slab reinforcement bar?

2119


how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?

2492


How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM

2014