What should be the 28 days cube strength for M-25 grade
concrete?How it is connected with acceptance criteria of
fck+3 as per IS 456-2000 and why?
Answer Posted / ashwani kumar
AFTER 28 DAY M-25 GRADE CUBE STRENGTH IS 25 N/MM2 , ITS
ACCEPTANCE CRITERIA IN THE IS-456, FCK+3 IS AVG
CHARACTERSRICK SRENGTH OF CONCRETE.
| Is This Answer Correct ? | 7 Yes | 4 No |
Post New Answer View All Answers
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
In case if concrete box girder bridges how is the number of cells determined?
what is flashing?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
Please tell me vasthu room sizes. Thanks.
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
in design case of structural member best suitrable percentage of steel limit is what
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
what is your role of in previous company as a construction manager
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
What is the withdrawal force of steel nails?
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
what is civil all interview questions
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
Define polar co ordinates.