Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is meant by trip circuit supervision & directional or
non directional over current ?

Answer Posted / k.prakashchandra

Trip circuit supervision is for supervision of trip circuit
for loss of DC supply,faults on trip coil or cables,faults
in auxiliary contacts and in itself, with breaker in any
position.Directional OCR acts for over current in one
direction only where non-directional acts for both the
directions

Is This Answer Correct ?    9 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Hi, Next week Iam appearing RRB exam for section engineer. So help me to get modal question papers for this position. Iam very thankful to you. Whether question will be fully techanical format or general form. Please give me a details regarding this exam.

1851


Define cut-off rate?

1033


In parallel operation time both NGR’s close or not close if both close what will happen

3673


what is the formula for computing cable tray size & capacity

2114


A parallel flow heat exchanger will perform better than a counter flow heat exchanger. State if the statement is true or false.

1193


plz send me the placement interview question and answers of whizchip(technical and apttitude)..i have an interview in next.

4952


What is a feedback in control system?

1156


How much voltage we need to apply in 33kv cable during hipot test of cable

808


What is contract demand in solar system?

1646


In radial network the source is fed from 1 end both ends at central

2057


After synchronization with grid what is the demand value QKVAR and how we will maintain that?

2211


We are designer please help me calculate the size of 11kv cables from step up transformer to M.V panel, total load is 5 mega watt distance 900 feet (used aluminum type cables) please provided formula for calculate the cable with example.

1599


hi frnds...pls send me aptransco previous papers .....pls..pls,,,(madhar.rocking@gmail.com)and suggest me some websites

2082


what are the differences between 'exhaust fan', 'heavy-duty exhaust fan' & 'super heavy duty exhaust fan'. what are their power ratings ?

2002


I need model question papers for RRB section engineer Chennai... Please send to my E-mail Id:- maitheerainbow@gmail.com

1893