Squirrel cage IM is the preferred choice, but if only a dc
supply is available then BLDC can be used.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
I have iti elec, 1st aid, and 5 yrs experience in 7.5 mw power plant. Am i eligeble for 11kv license in telangana state..when, how to apply for that.?
how to calculate the capacitor to maintain power factor?
what is vA rating and class of a ct.
what is the easiest method of short circuit current calculation ? pls. derive with a mathematical example in real life application.
how to calculate vfd o/p voltage by frequency
What is the instrument to check the rotating diode fuse of alternator in running conditions?
area control error
can you any one give exact mathematical relation between AC current and DC current?
What are the main advantages of generalized error co-efficients?
How to calculate the copper in HT motors if KW, RPM & Voltage is given
We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible
How to check the LM324 Ic
when we have to purchase the transformer by own i.e how much load will preferred HT connection?
what is a bus riser in power system and why it is used
Define conversion efficiency of a power amplifier. What is its value for class c power amplifier?