what is the difference between site engineer & site incharge
Answer Posted / prafulla
site engineer execute the work only
site engineer execute the work and all site material
machinery and manpower at timing
| Is This Answer Correct ? | 3 Yes | 6 No |
Post New Answer View All Answers
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
which has high compressive strength between hollow block and brick masonry?
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
what is the list of building construction equipment & teir output?
What is rolling stock
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
what is the calculation of raw material for 0.35cum of m-15
can you give me the details of rate analysis of steel and concrete?
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
How to build the floor to ceiling bookcase?
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.