what is the difference between site engineer & site incharge
Answer Posted / prafulla
site engineer execute the work only
site engineer execute the work and all site material
machinery and manpower at timing
| Is This Answer Correct ? | 3 Yes | 6 No |
Post New Answer View All Answers
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
How to find out slope footing concrete
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
How to hide dimensions in autocad?
can you provide a link for manual design of building?
Draw the cross section of a boundary wall and label its part with detailing?
Define a polyline?
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
how to calculate the size of triangular ring in rcc column?
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
Which is the direction of negative angle?