what is the difference between site engineer & site incharge
Answer Posted / mayank jain
site engineer is responsible for a design factor and management of activities on the site .
site in-charge is responsible for a labor management and
material wastage.
| Is This Answer Correct ? | 10 Yes | 12 No |
Post New Answer View All Answers
What is min thickness,min grade of conc & age of PQC ?
Who built the sears tower?
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
which red: used in roof teping, then use only cement
What is the primary difference between adsorption and absorption?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
pls give me some basic informations in construction of a structure?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
What is difference between limit state and working stress method? How it is applies in building structure.
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
What are some structures that may be subjected to fatigue?
Describe Briefly The Various Methods Of Concrete Curing?
what energized you to complete your course?
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
Why joints are provided?