what is the difference between site engineer & site incharge
Answer Posted / mayank jain
site engineer is responsible for a design factor and management of activities on the site .
site in-charge is responsible for a labor management and
material wastage.
Is This Answer Correct ? | 10 Yes | 12 No |
Post New Answer View All Answers
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
How many kilo-newtons equals 1000 kilogram?
How much of the strength of concrete comes from post- production curing?
What is the material consumption- cement,sand,tiles etc for Toilet dado?
how to calculate steel for slab or footings?
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?
how many tonnes equals to one cubic feet?
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
what is the max. area can we apply the plate load test ?
What are the different softwares used for cad?
What Reinforcements Are Used In The Process Of Prestressing?
How to calculate chejja reinforcement
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?