what is the difference between site engineer & site incharge
Answer Posted / mayank jain
site engineer is responsible for a design factor and management of activities on the site .
site in-charge is responsible for a labor management and
material wastage.
| Is This Answer Correct ? | 10 Yes | 12 No |
Post New Answer View All Answers
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
In which code the the maximum height of concrete casting has been explained
How and where are aqueducts built?
What are some facts about concrete?
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
What are the uses of layer?
In Rcc ratio calculation I wanted to know quantity of Steel also.
What glue is least sticky?
psc girder detail
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
Define What is diversion tunnel in a dam?
How to calculate material and labor required for 100 m2 plaster?
what is the price of a cubic meter of concrete on international market?
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
what is the coefficient for running feet to cft coversion both area and price