Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the difference between site engineer & site incharge

Answer Posted / mayank jain

site engineer is responsible for a design factor and management of activities on the site .
site in-charge is responsible for a labor management and
material wastage.

Is This Answer Correct ?    10 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is min thickness,min grade of conc & age of PQC ?

9514


Who built the sears tower?

1274


How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?

2109


which red: used in roof teping, then use only cement

2065


What is the primary difference between adsorption and absorption?

1195


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

2028


pls give me some basic informations in construction of a structure?

2100


What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

2145


 What is difference between limit state and working stress method? How it is applies in building structure.

2371


i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI

2398


What are some structures that may be subjected to fatigue?

1189


Describe Briefly The Various Methods Of Concrete Curing?

1153


what energized you to complete your course?

2473


how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?

6268


Why joints are provided?

1204