what is the difference between site engineer & site incharge
Answer Posted / sjtbehera
Site engineer is responsible for site execution.
but sit incharge is responsible for project execution
| Is This Answer Correct ? | 14 Yes | 5 No |
Post New Answer View All Answers
What are your future hopes for this job?
How do you calculate load bearing capacity of a waffle slab?
what is moment-curvature relationship in semi rigid connections??
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
Will water damage concrete?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
What is braced excavation all about?
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
How can i display 5 asterisk and another 5 asterisk )?
what is the maximum number of course that can be laid according to IS code and the max height.
Specific gravity of cement?
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
why is the column design?
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?