19. Students from different universities.
A speaks hindi and bengali.
B hindi and english.
C english and bengali.
D tamil and hindi
E bengali and tamil
20. Interpretor between C and D
A only
B only
E only
A ,B and E
21. Can't speak without interpretor
B&E
A&B
A&C
B&E
Answer Posted / guest
20. a,b and e
| Is This Answer Correct ? | 21 Yes | 1 No |
Post New Answer View All Answers
33 1/3 of 101 + 296 is
Total balls z,red balls N remaining are blak balls,then %of black balls equal to
A bus started from bus stand at 8.00a m and after 30 min staying at destination, it returned back to the bus stand. The destination is 27 miles from the bus stand. The speed of the bus 50 percent fast speed. At what time it retur4ns to the bus stand
How Can A Cake(circular) Be Cut Into 8 Pieces By Making Just 3 Cuts?
Two trains are travelline at equilateral .Train A is travelling in the direction of earths spin.Other train B is travelling in opposite direction of earths spin.Which trains wheels will wear first?and why?
How many ways can one arrange the word EDUCATION such that relative positions of vowels and consonants remains same?
inept : clever :: languid :
A sequence is given. You should find out error & write correct 1 2 5 10 13 26 29 48.
The price of sugar increases by 20%, by what % house-wife should reduce the consumption of sugar so that expenditure on sugar can be same as before
An apple seller is having some apples. He is selling half of the apple what he has plus half the apple to the first customer. In the same way he sells the remaining apple to 7 customers. After selling to 7 customers, he has no apples with him.
rrb second stage written exam in aptitude test model papers
what is the exact qualifing marks for group 1 prelims
Starting from point A, Jayant walked 15m towards west. He turned left and walked 20 m. He then turned left and walked 15m. After this he turned right and walked 12m. in which direction is Jayant from X and how far has he walked from point X?
A can do a piece of work in 20 days, which B can do in 12 days. In 9 days B does ¾ of the work. How many days will A take to finish the remaining work?
Find the value of @@+25-++@1..., where @ denotes "square" and + denotes "square root".