what is the diffrence between preventive maintinance
corrective maintinance?

Answer Posted / basheer ahmed

PREVENTIVE MAINTINANCE IS CARRIED OUT TO AVOID THE
OCCARANCE OF FAULTS AND CORRECTIVE MAINTINANCE IS DONE TO
CORRECT THE FUALT AFTER IT OCCURS.

Is This Answer Correct ?    2 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to electrically make connection to ferroli GN2N?

1470


what r PID controllers?why they r used?what is there purpose?plz Explain in detail

1620


Differentiate between Zero and Negative sequence current

1443


by using pump duty, how we will can calculate the motor duty(KW)? is there any standard or formula.

1520


what is the soft starter principle? how is connection diagram? what is the procedure for checking the connection?

1714






What are the material used for inductance coil?

693


What the main causes of transient interruptions on Over-Head Distribution Lines?

1585


WHATIS TIME CONSTANT? WHATIS ITS SIGNIFICANCE? ILLUSTRATE THROUGH EXAMLES.

1671


Draw a SLD for main panel for school having connected load of 1200kw and emergency generator 200kw.also show the increase of additional load of chiller 225kw in the lv panel indicating meter postion size of transformer ,cables and capacitor bank.

525


how to get electrical supervisor competency certificate in gujarat. i did 3 year diploma in electrical

2072


slipring induction motor starting time Lrs operating why lrs starting time lrs outer body didn't get shock

1467


WHat is the general checks required for Dry type transformers

1651


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

1564


what is mppt (maximum power point tracking ) and how they used in solar power generation ??? what are the main components used in mppt?????

2787


if field breaker of generator is closed prior to its rated speed on a power generating unit. what will be the effect on generator, unit transformer and starting transformer.

1287