adspace
What is the exact meaning for under & over reinforced beams
& when they have to used..
Answer Posted / naveen k. singh
when moment of resistant of a section is gteater than the
design moment then section is designed for under reinforced
section/beam.
when moment of resistant of a section is less than the
design moment then section is designed for over reinforced
section/beam.
OR
when Ast of a section is greater than Ast for balanced
section then section is called OVER REINFORCED section.
when Ast of a section is less than Ast for balanced section
then section is called UNDER REINFORCED section.
| Is This Answer Correct ? | 147 Yes | 23 No |
Post New Answer View All Answers
HOw much % of premium on DSR-2013 currently
Technical Question of Civil Engineering
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
Which is the latest version of solidsworks?
Why do you want to work here
how can we calculate steel value, depending on load
water leak detection system question & answer
plz.show development and anchorage length in simple diagram.
what is the 0 value in quantity surveying
please send me bhel questions on rupesh.017@rediffmail.com
I need to constructive work in amaraj batteries