what is the principale of vortex flow meter.
Answer Posted / m.murali- inst.technologist
Rate of frequency of vertices after the bluf body is
directly propositional to flow
| Is This Answer Correct ? | 11 Yes | 1 No |
Post New Answer View All Answers
How to calibration a control valve?
model question paper of instrumentation for Jindal GET 2010.plz reply sudhanshukumar08@yahoo.com
How earthing can be checked????
Q1: Consider part of a control loop, which excludes the transmitter, consisting of a process, a controller and a control valve which may be represented by two dead times of 0.5 min each and three exponential lags of 0.8 min., 1.0 min. and 1.5 min. respectively. We wish to express this system as an overall first order plus dead time (FOPLD) model ie gain, time constant and process dead time. (We will see later that this is often done, to simplify controller tuning). For this exercise, gain is considered to be 1.0. (A) If the transmitter is a flow transmitter whose behaviour can be described by a dead time of 0.2 min. and an exponential lag of 0.5 min. in terms of the overall dead time and overall first order lag how can the system behaviour be approximated ? Overall dead time = Overall time constant = (B) If the transmitter is a temperature transmitter with a temperature sensor in a protecting well whose behaviour can be described by a dead time of 0.7 min. and an exponential lag of 15 min. how can the overall system behaviour be approximated now? Overall dead time = Overall time constant =
What are different type of instrument cable
How can i test procedure grounding for CAT-7 cable? Or How can we test procedure CAT-7 Cable Electrically safe?
Why is the orifice tab provided?
can you send remote seal interface level transmitter calculation steps for oil water saperator.
Turbidity analyzer working principle ?
How flow can be measured with dp?
How would you choose differential range?
we are having yokogawa centum cs3000 dcs in our power plant. i need some of the operator guides NOT to appear in HIS0163 AND HIS 0162 but it shoul appear in HIS0164 HOW TO DO IT?
There are two chlorination tonners both are connected to two pressure swithes and the pressure switch is connected to SOV which operates the valve to changeover the tonner selection i.e if pressure one tonner goes low the other tonner should come in line if it is inautomatic selection design a circuit using relays ?
Why is it necessary to use compensation leg to measure the liquid level in a closed or pressurized tank?
what is 24vdc live and dry supply