compare the cost of construction of a building by cement and
one in which cement is substituted by fly ash.
Answer Posted / dushyant bansal
Cement can not be substituted by fly ash
Only some specific amount of fly ash can be added to cement
to reduce the cost of cement.
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
How much for the BRC lapping in full yield and half yield < and which table to get it ?
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
mean of NH4 pipe
How can we make a hole in a solid rectangle using solidsworks?
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
five benefits of using standard terminology in the measurement process
Explain what are the phases inspections are done by local authority while construction?
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
Material calculation of cm 1:6 for 1sqm
How to calculate the crank rod in slab
how calucate cement sand ratio for plstering
Basic civil interview questions