All industrial (power plant,
sugar. Cement etc...) chimneys
are circular in shape rather
than any other shapes...
Y..?
Answer Posted / rkr
Benifits of circle:-
A> Surface area to volume inside ratio is important.Surface
area related to manufaturing cost, and volume is amount of
gas delivered.
B> resisitance in flow of gas will be good.
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
how does the lybrinth glands work in sealing a turbine? how exactly turbine sealing is done? principle of it?
Name the strongest and weakest type of atomic bonds?
for under water excavation works, can i have some standard codes and specifications(international)
What are the compressor and types?
what is draft and draft loss?in a boiler,how is draft created?
Explain about front drive mechanism in vehicle
how can i access syllabus of different psu.plZ help me
Explain how the lubricating oil circulates in a diesel engine.
Please inform about mahagenco exam 2010?
What are the advantages of white metal?
WHICH ONE IS PREFERRED, VERTICAL OR HORIZONTAL PUMP WITH COMPLETE TECHNICAL DETAILS
What are the some examples of a periscope?
How is propeller fitted in shaft?
What is the specific heat of water?
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb