If process order is technically closed, by mistake
I want to process that order again can I do it?

Answer Posted / bharathish

First you have to do revoke Teco and then process the
order,other wise system wont allow..

Is This Answer Correct ?    18 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are all the ‘technical types of bom’?

636


What is the use of plm (product lifecycle management) in sap pp?

593


What is meant by payscale structure?

541


What is opening period?

632


What is time phased Planning?

1303






What is 'capacity planning'?

547


Mention what is the use of t-code cs20 in bom?

637


What is the recruitment cycle?

598


Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN

4303


How requirements( pir,sles order, customer requirement) are reduced after they are produced?

617


Difference between Routing, Ref op set, Rate routing and Ref rate routing.

2322


What is the purpose of Catalog? how you reverse UD?

1551


Explain how can you create production order without routing and bom?

601


What is pi sheet

2119


Explain Kanban.

1101