If process order is technically closed, by mistake
I want to process that order again can I do it?
Answer Posted / bharathish
First you have to do revoke Teco and then process the
order,other wise system wont allow..
| Is This Answer Correct ? | 18 Yes | 0 No |
Post New Answer View All Answers
How you get the ticket?
In om, how to get the details for a group of employees (ex.) Group of drivers in the organization?
Overlapping and splitting, where do you assign?
Can't one material be assigned to more than one operation in a routing?
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
What are the key fields in MRP views?
What are the production process in sap?
Explain variant configuration
What are the three 'mrp procedures'?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?
We want to report on several status combinations like each order that has the status ‘not deleted’ and ‘not technically completed’. What set up is required?
What is the use of t-code cs20 in bom?
what is std info set? where it is used?
Explain the uses of the simple maintenance interface?