How to configure the planning calendar for the ATP
calculation where goods are shipped every other working day?
Answer Posted / srinath sastry
Have alternate working days in the plant calendar attached
to the corresponding Shipping point
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What are the production process in sap?
Define stock requirement
Explain the gaps and the steps involved in them.
Can any body explain me why work scheduling view is required for semi finished and finished products?
In sap-pp what are the costing parameters?
What is planned consumption and unplanned consumption?
What is standard order type
What happens to plan after it has been converted into production order?
Special Procurement type 40 – proc. form alt. plant
How did you configure the payscale structure?
You want to insert an inspection check point at the end of an operation. How would you do that?
What are the types of MIC?
When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP
Control keys
What is meant by payscale structure? How did you configure the payscale structure?