Answer Posted / kathiravan.b
3+4=25, 3*3=9, 4*4=16, 9+16=25
4+5=41, 4*4=16, 5*5=25, 16+25=41
5+6=5*5=25, 6*6=36, 25+36=61
Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
A can do a piece of work in 20 days, which B can do in 12 days. In 9 days B does ¾ of the work. How many days will A take to finish the remaining work?
Complete the series:5,6,7,8,10,11,14,__.
Could anyone please email the answers to the verizon 2014 aptitude test
if 2x-y=4 then 6x-y is
Fill the empty slots. Three FOOTBALL teams are there. Given below the list of maches. played won lost draw Goals for Goals against A 2 2 *0 *0 *7 1 B 2 *0 *1 1 2 4 C 2 *0 *1 *1 3 7 the slots with stars are answers.
15 Men take 21 days of 8 hrs. each to do a piece of work. How many days of 6 hrs. each would do if 21 women take. If 3 women do as much work of 2 men.
A piece of cloth costs Rs 35. If the piece were 4m longer and each meter costs Re 1.00 less, the cost would remain unchanged. How long is the piece?
36:4 :: 9: ?
slur : speech :: smulge : ?
A can have a piece of work done in 8 days, B can work three times faster than the A, C can work five times faster than A. How many days will they take to do the work together ?
The difference between the compound and simple interest on a certain sum for 2 years at the rate of 8% per annum is Rs.80,What is the sum?
The perimeter of a rhombus is 52 units. One of its diagonal is 24 units.What is its second diagonals length?
a number of subsets of a set s is 128, then s has
The ratio between the perimeter and the breadth of a rectangle is 5: 1. What is the length of the rectangle If the area of the rectangle is 216 sq. cm?
A hotel has 10 storeys. Which floor is above the floor below the floor, below the floor above the floor, below the floor above the fifth.