i'm working on progA , in that program i want to see the
userids of the users who work on this program?
Answer Posted / kumar
If anyone does not know the answer, plz DO NOT POST THE
ANSWERS AND POLLUTE THE SITE! The info will be read by
somany people who SCOLD!!
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
How to handle duplicate error handling in RPG?
what is kids-rpg?
Program to read marks of 10 students for 4 subjects and compute and display total marks and status of each student in rpg
can I touch the array during treatments?
What is file identifier where we can use?
what is an online rpg?
what was the robotech rpg?
What is the difference between copybooks and subprocedures in as400?
How can we override a file during runtime in rpg?
When it is desirable to describe files Internally?
what is *place and *auto keyword in prtf ?plz explain
what do you mean by an input subfile, what are the keywords required?
how can I tell when to replace the array?
what is the necessary keyword needed to scroll subfile records?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.