Cube tests of concrete are failed at 7 days and 28
days.What is your next action?
Answer Posted / kishorecivil
NDT testing has to be done and if it fails then go for
recto method that is strengthing of concrete and concern is
not demolish it's time taken and it will effect time and
finacial.
| Is This Answer Correct ? | 8 Yes | 7 No |
Post New Answer View All Answers
Why are pull-out tests performed for soil nails?
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
how to do sudoko puzaals?
how to create our resume?
sir, whitch is the best book (writer name) for prepration of gate....
what is the weight of 10mm,20mm,40mm aggregate
How can we make a hole in a solid rectangle using solidsworks?
For the construction project what capital cost has to be taken in consideration?
What are the applications of modulus of elasticity?
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
.5Ast
what is c4x light weight cement blocks
Slump Values for works?
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete