Can anybody tell me that why we use option(*nodebugio)in H-
Spec?
Answer Posted / sajied
if u not use then control goes to f spec every time
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
how do I play {insert rpg system here}?
If my rpg program has a date field, what extra care I have to take while compiling that rpg program? If the file is keyed and I have declared the file as well as key list properly in my program. Still am getting an error message like "chain/reade operation is not allowed" what may be the case?
What is the purpose of record level identifier?
1. If there are two programs using same file and 2 users are using the file at the same time and what can be done to allow them both to access? 2. How can remove lock from the file for accessing it by both users?
do you use message subfiles? What are the necessary keywords required coding a message subfile?
how can you display specific subfile page on the screen in unequal subfile?
what is a rpg?
How to define data area in RPG program? In which scenario multi occurrence DS is use in AS400?
thanks mr.Harshad R Suryawaunshi,i'm new to as400 i think you are telling in rpgile i know only rpg400 if possible can you tell in rpg400
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
Program to read marks of 10 students for 4 subjects and compute and display total marks and status of each student in rpg
how do you use commitment control in rpg?
how do I preserve and clean the array?
how do I declare a minor?
What is the difference between copybooks and subprocedures in as400?