how many max steps can we use in a job? pls answer to my
question
Answer Posted / saki
16
| Is This Answer Correct ? | 1 Yes | 22 No |
Post New Answer View All Answers
how would you create a temporary dataset? And where will you use them?
What is the significance of addrspc parameter in exec statement?
whats the diff bw the evaluate also and and?
Explain the function of dd name parameter with a 2 part structure; audit.report?
What is the motivation behind coding class parameter in job statement?
What are the 2 types of parameters in dd statement?
Explain the jcl exec statement?
WORKING-STORAGE SECTION. 77 W-A PIC 9(3)V99 VALUE 23.75. 77 W-B PIC ZZ9V99 VALUE 123.45. PROCEDURE DIVISION. MOVE W-A TO W-B. DISPLAY W-B. STOP RUN. compiler : IGYGR1080-S A "VALUE" clause literal was not compatible with the data category o subject data item. The "VALUE" clause was discarded. WORKING-STORAGE SECTION. 77 W-A PIC 9(3)V99 VALUE 23.75. 77 W-B PIC ZZ9V99. PROCEDURE DIVISION. MOVE 123.45 TO W-B. MOVE W-A TO W-B. DISPLAY W-B. STOP RUN. 2375
//S10 EXEC PGM=ICETOOL //TOOLMSG DD SYSOUT=* //DFSMSG DD SYSOUT=* //CON DD DSN=VAR.INPUT1,DISP=SHR // DD DSN=VAR.INPUT2,DISP=SHR //OUT DD DSN=VAR.OUTPUT,DISP=(NEW,CATLG,DELETE), // SPACE=(CYL,(5,5)),UNIT=SYSDA //TOOLIN DD * * Splice the needed data from the two VB files together SPLICE FROM(CON) TO(OUT) ON(5,5,CH) WITHALL - WITH(12,5) WITH(22,20) VLENMAX /*
WORKING-STORAGE SECTION. 01 GROSS-PAY. 05 BASIC-PAY PIC 9(5). 05 ALLOWENCES PIC 9(3). PROCEDURE DIVISION. MOVE 1000 TO BASIC-PAY. MOVE 250 TO ALLOWENCES. DISPLAY GROSS-PAY. STOP RUN. 77 W-A PIC 9(3)V99 VALUE 23.75 77 W-B PIC ZZ9V99 VLAUE 123.45 after the statement MOVE W-A TO W-B what will be W-B's value? a.123.75 b.b23.75 (where b indicates space) c.023.75 d.invalid move
Where can program checkpoints be stored for use in a restart?
What is the maximum length of a single line of jcl?
what happens in conversion stage in job processing?
How can a jobs execution priority be modified?
What does it mean by Restart and Checkpoint in JCL ? How are checkpoints being taken and what is their usage ? How to use Checkpoint macro on a JOBSTEP ?