Answer Posted / ram kumar saini
The size are 1.5 time of motor full load current
| Is This Answer Correct ? | 4 Yes | 6 No |
Post New Answer View All Answers
What is the form name of 'c' license, I want to download in web
Why r u using pf panel. what the uses
Can we use a absolute encoder to show rpm of a motor ? what about the condition when power is off ? what is difference if a incremental one is used ?abanirout@gmail.com
H.t motor 6600 volt to same motor lt supply 440volt supply applyed to h.t motor to effect....
why 15 kw motor winding resistance is low then 5 kw motor winding resistance?
what ispositive, negative, zero sequence impedence?
A 400 V, 50 Hz, Δ connected synchronous generator has a field reactance of 0.1 Ω and armature resistance of 0.015 Ω. At full load, the machine supplies 1200 A at 0.8 pf lagging. Under full-load conditions, the friction and windage losses are 40 KW and the core losses are 30 KW. What is the machine’s overall efficiency? Ignore any field circuit losses.
How do I calculate a WTI CT ofa 1250kVA 6600/400V transformer
How many types of colling system it trformers?
What is super thermal power plant? and how it will differ from normal thermal power plant
54 Comments Alok and Bhanu play the following min-max game. Given the expression N = 38 + X*(Y – Z) where X, Y and Z are variables representing single digits (0 to 9), Alok would like to maximize N while Bhanu would like to minimize it. Towards this end, Alok chooses a single digit number and Bhanu substitutes this for a variable of her choice (X, Y or Z). Alok then chooses the next value and Bhanu, the variable to substitute the value. Finally Alok proposes the value for the remaining variable. Assuming both play to their optimal strategies, the value of N at the end of the game would be?
how to read idmt curva
sir i had plane to do some project with the base of hopkinson test in AC supply its possible
hai now i am working as a electrical design engineer in construction field can i get a job in oil and gass field or power plant project as a electrical design engineer?
What is the tests required for a 132 kV, 400 kV , 765 kV for a Circuit Breaker and Power Transformer before commissioning ?