What are the GAP analysis you identified in your project?
Answer Posted / laxman
I have come acrossed this below GAP Analysis in my
experience
At the time of AS - IS prepared; Client requirement is
" All the correction done by end user from the default
values of the critical fields at the time of order creation
(before saving)need to be get in report form."
It was agreed with the assumptions that, it will be
possible at STD SAP.
Since Standard SAP does not capturing the critical field
changes before saving the sales order, we could not able to
use the standard SAP report.
This is called GAP analysis. Simple meaning is " the
differents between agreed work and completed work".
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
How to assign division to sales organization?
I have created value contract with order type WK1 in VA41. The target value is 500 USD and the net price is 1000 USD. There was no pop up message or error thrown while saving the contract when the net price exceeded the target value. And the system allowed to save the contract. Is there any configuration available to activate the warning or error message or any enhancement need to be done?
When we include a new customer, we have to maintain condition record every time or there is a process by which we can validate the condition record to that new customer belonging to the same sales area?
how text is determined in Invoice,What are tools used in To_be study
What is the difference between pgi cancellation and returns order?
What is availability check?
What are the purposes of the number range objects J_1IEXCLOC and J_1IEXCINV? In which conditions 1. either of the two, or 2. both the objects should be used?
During route determination the system also needs to know the departure zone of the goods to be shipped. How does this information come into the sales order?
Define to which organizational element is central in shipping?
customer hierarchy in sap sd for account determination
What is a field catalog?
Output with different language is it possible to have two delivery notes in two different languages?
Can you share master data between several sales areas?
What are the different lists in sap sd.
Some materials have been blocked for procurement and production. Even though deletion flag is set for a material/plant level, the order can be still entered ( with a warning message). Is there a way to block such transactions for a material flagged for deletion?