Difference between the setting time and hardenin time of
concrete
Answer Posted / sujit ( hari machines)
setting time is taken by concrete to its minimum strength
in 7 days. harden time is time taken by concrete to its
maximum strength.
Is This Answer Correct ? | 5 Yes | 10 No |
Post New Answer View All Answers
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
what is hydrostatic paradox?
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
load combinations how many types for staad design purpose?
What is the diff between cad & cadd?
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
what is flexible and rigid footing?
how to shuttering is used in slab
how many type of admixtures for water stored structure?
For Wet Mix Mecadam design what is Optimum moisture content
roll of DLC in road constructions
What is soil enforcement?
what are the types of design? which type of method is used at what type of design & why?
sir please send me campus placement questions in civil engineering
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.