Difference between the setting time and hardenin time of
concrete
Answer Posted / sujit ( hari machines)
setting time is taken by concrete to its minimum strength
in 7 days. harden time is time taken by concrete to its
maximum strength.
| Is This Answer Correct ? | 5 Yes | 10 No |
Post New Answer View All Answers
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
what is difference between GTS bench mark and temporary bench mark
What is the strongest bridge for a school contest?
What are the different types of foundation?
how we calculate the grade of the Bituminous materials.?????
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
What does a construction cost covers and what does not?
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
significance of specific surface area of particles?
The portion of a brick cut across the width is called?
What is the diameter of the 3"inch nails?
Why does the pressure increase under soil?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Define What are the uses of alloys in daily life and how are alloys made?