Difference between the setting time and hardenin time of
concrete

Answer Posted / sujit ( hari machines)

setting time is taken by concrete to its minimum strength
in 7 days. harden time is time taken by concrete to its
maximum strength.

Is This Answer Correct ?    5 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.

1712


what is hydrostatic paradox?

1680


What is the formula for figuring out how many gallons of water are in a pipe by the foot?

629


load combinations how many types for staad design purpose?

1700


What is the diff between cad & cadd?

621






how much is the maximum compressive strength of soil cement and soil-cement-microsilica .

1792


what is flexible and rigid footing?

1820


how to shuttering is used in slab

1286


how many type of admixtures for water stored structure?

1693


For Wet Mix Mecadam design what is Optimum moisture content

1582


roll of DLC in road constructions

1388


What is soil enforcement?

763


what are the types of design? which type of method is used at what type of design & why?

1771


sir please send me campus placement questions in civil engineering

3099


a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.

12642