If connected load of Asphalt plant is 375Kw. What suitable
KVA DG set is required. What is calculation formula. what
extra load have to consider. in what efficiency it will
work.

Answer Posted / munish saini

KW=KVA*PF
PF=.8
KW=375
KVA=KW/PF,=375/.8=468.75KVA

20 Percent required more as eppiciency Factor
so required dg should be=562.5 KVA

Is This Answer Correct ?    4 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate ant test the burden of Current transformer

1950


where was current transformer protection units used and why??

1543


1.WHAT IS A SMART CAPABLE DB ( DISTRIBUTION BOX) ? 2. HOW TO DECIDE THE TYPE OF DB TO BE USED ( RECESSED/ PLUG TYPE/ SMART ETC ETC? 3. WHAT IS MILLENEUM BUS BAR USED IN DB? 4.DIFFERENTIATE MCCB AND MCB.

1399


how to find number of run cable laying[LT side] for transformer & alternator secondary side? [above condition for getting output power transformer to main panel side] give the example.

1597


where solid grounding and where grounding through ngr done and why?

2087






explain which quantities change in the starting and the and the running condition in induction motor

946


Why is a plain induction motor unsuitable for wide speed control?

1817


what is the difference between active power and reactive power and apparant power in practical as well as theoritical

1445


how many current required for hypo test

1453


why the India electrical supply transmission loss is high when compare to us

1553


How to do fabrication , busbar and wiring cost for : 1. LT Panels 2. C& R Panel

1443


What conditions are required for transformer to operate at low frequencies ?

1518


what is p.s impedance measurement test in earthing transformer?

1842


State nyquist stability criterion.

635


how you will decide the distance between the power transformer and its fencing

1456