what is the abrivation of GE- 9FA and 9E gas turbines
Answer Posted / naga
GE gas turbines were basically divided into 2 different
classes.
1. E - class Ex: 6B, 9E
2. F - class Ex: 6FA, 7FA, 7FB, 9FA, 9FB,9FA+e
F class machines are newer machines and has higher power
generation capacity.
9FA means : "9" indicates Frame size and "F" indicates F -
class machine. FA and FB are two categories of F - class
machines.
9E means : "9" indicates Frame size and "E" indicates E -
class machine.
9FA+e means : "9" indicates Frame size, "F" indicates F -
class machine and "+e" indicates extended version of 9FA.
For ex: 9FA+e 'inspection interval' is more compared to 9FA.
| Is This Answer Correct ? | 43 Yes | 2 No |
Post New Answer View All Answers
Briefly explain the term gravity
write 2 important assumption on fin theory?
how we relate superheating & subcooling with chiller load
How to calculate IKW (inputkilowatt) ie.. efficiency of a airconditioning chiller plant capacity of 310TR
What is the difference between Michell type bearing and anti friction bearing and the application.
how to calculate bearing width
how can I masurement the circale weight ? like- 312mm i/d x 392mm o/d x 6mm thick.
Hi i am having 5 yrs of exp in Proe wildfire,Anybody have the jobs related to Aerospace
As a foreign applicant, what do you understand about our company before sending your application CV for consideration?
please provide me the calculation for the thickness of duplex stainless steel pipeline thickness used in process industry ( Water). The details are given below. Diameter : 3" and 4" Thickness : 3.91mm, SCH40 Operating pressure : 62 bar Operating Temp : 35 degree ASME31.3
Is a diesel engines maximum rpm limited by the diesel burn rate?
In convection heat transfer, if heat flux intensity is doubled then temperature
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
explain about where should we use deep groove ball bearings,angular contact ball bearings,spherical roller bearings,taper roller bearings,cylindrical roller bearings and thrust bearings
What is the purpose of bilge separator