Answer Posted / ch jaya murali
We are Manufactured the same panels. the panel principal is when the mains fails is there that time the microprocessor is detected mains are fail. After the supervising the mains the amf controller is give the sense to crank. And When the Ingen is run the controller is supervise the alternator supply. That supply is present and healthy, the dg cont actor sence is given to dg cont actor. that mount the dg supply is present in out put terminal. when the mains present that monument mains supply is healthy that time dg supply is break the microprocessor and give the mains supply. After the cooling time the dg is stop sence is given to stop solenoid.than the in gen is stopped.
| Is This Answer Correct ? | 35 Yes | 8 No |
Post New Answer View All Answers
how cables go in and come out for distribution from the feeder pillar box?
What are the conditions to be satisfied for parallel operation of dc generators?
what is the role of transistor in Circuit?
Two liquids hot and cold in two vessels are there and an metal bar acts as a conductor of heat between the two vessels. what happens then. what happens after 24 hrs?
sir, 3phase induction motor takes different pf and different KW in three phase while running,explain reason
what is the difference b/w ATS and HTS?
What happen when change order of CT in GIS feeder?
why we use condenser in the thermal power plant, althrough the same vapour will be again heated
If we connect a motor and generator together (I mean that the generator gives the motor electricity and the motor gives the generator movement) regardless the losses. Will the generator still generate and the motor still move?
what is the maintaining Cf in UPS.
Advantages/Disadvantages of earthing of neutral bus on MSB instead of separate neutral earthing for transformer/DG sets feeding to MSB
What is Phase to Phase clearance for 800V System Operating Voltage as per IEC61439
why T/F winding temp measurement cts are odd secondary current ie,109A/1.2A/1.4A?
what kelvin's law ?
i need to give section engineer (electrical engineer) for RRB. Please suggest some book