is a transport route bidirectional?can you transport
requests generated during client copy(scc8)from production
to dev?
Answer Posted / vinvk
@hameed,
then how can you do client copy from prd to dev using
export-import method.(scc8)
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
What is the different architecture between SAP 4.7EE & ECC5.0
What are the key activities that you perform as part of sap basis support?
1)Have you used performance tuning? What major steps will you use for these? 2)In production what is the user exit? 3)What type of user exits have you written? 4)Difference between Search Helps and Match Codes 5)On which even we can validate the input fields in module progams? 6)what are the table controls in BDC ? 7)what is the difference between bdc and lsmw ? 8) If the scripts are client dependent, what above driver program ? (client dependent / independent) 9). I have two pages, In one page I want address, Header, Main & footer. In the second page I want only Main. How to do it? 10) Will 50,000 records be uploaded directly into APP's Server? 11) What is the button to change the variant in ALV ? 12) If your project is support project ? when is your implementation has completed ? 13)In start of selection, if we perform validation, what happens ? 12)How to join 3 tallies & looping. We have developed a program in a client say (200- client) and 210 has test data. No developing rights. How to test data? 13)How to transfer data which is coming from are report as output to another report 14)How to create standard text and how do u transfer it ? 15)What are the views when we are creating Material ?
What are the different types of rfc?
What are the different login and password parameters that can be applied in sap system?
what are the main issues you faced in the implementation project?
Hi i have 2.10 yrs of experience on Sap Basis...been working as a sap basis consultant.but unable to get through MNC companies...On what criteria does HR select the candidate.does my academics matter coz they are not good thou i am a B.tech graduate
what is garbage collector. is there any way to set the time to gc?
For ex: i scheduled one ABAP program as a background job but it was running 10 days, how to analyze the problem?
What are patches you applied?
Explain what is the use of reference and service user in sap?
How do you distribute the load?
Why we execute SGEN, which Tables it modifies,will it cause DB growth? is it possible to execute SGEN later on after Golive?
What is the role of “ application server” ?
How do you solve oracle archive struck?