how to calculate the steel for rcc slab?
plz tell me the formula for calculating the steel?

Answer Posted / shafiullah

ast = ( M ) / (.87*fy*(d-.42*xu))

Is This Answer Correct ?    89 Yes 32 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?

1654


Define What is passive earth pressure ?

685


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

1455


how much of the strength comes from post-production curing

1859


how to prepare site mix design

1540






Explain what is the difference between built area and super built up area?

678


For fine aggregate which is most suitable River sand or crusher sand & why ?

1318


What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code

1601


What is the basic difference between OPC

1416


For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.

1584


 What is difference between limit state and working stress method? How it is applies in building structure.

1757


how much shouid be the rate for ready mix concrete per cubic meter

1454


How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097

1748


1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.

2303


how to calculate number of bitumen for road asphalt

955