If connected load of Asphalt plant is 375Kw. What suitable
KVA DG set is required. What is calculation formula. what
extra load have to consider. in what efficiency it will
work.
Answer Posted / srinivas
if the connected load of plant is 375kw. but any time all
the load may not be there. if peak load may be 300kw at any
instant so KVA rating of DG=KW/cos(phi) so you can take
300/0.9= 333.33 so you can take 350KVA Dg you can go for.
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
what are inductive and capacitive voltage transformers.what are their applications
why ht motors are star connected?
What is the difference between Encoder and Resolver?
If i am running of spindle at 2000rpm ,but How to spindle stop at the second I am resetting the machine in CNC machines
5- What is the task (function) of the excitation and isolation transformers in power plant? 6- What is the task (function) of LCI (A), LCI (B) and LCI (COS) in power plant? : LCI (A) and LCI(B) are load commutating inverter for generator turbine starting. , LCI (COS) is load commutating inverter change over switch
What are the components of feedback control system?
what is the significance of terminal voltage and phase sequence in the operation of paralleling of two generators?
The electromagnetic torque developed is proportional to what in a D.C series motor?
Why is negative feedback invariably preferred in closed loop system?
can any one know is sbi interview based on merit or based on roll number
What is the meaning of loop in transformer
In EDO ACBs what is a purpose of closing coil and motor, what is the operation of these devices are they inetconnected. means if we give supply to motor and by BCS we charge Closing coil,what exact is operation is and how it charge a spring of ACB. Sir if anybody has an wiring diagram please send me the link to operate and EDO breaker.
Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.
What is clock position of Transformer?what are the clock positions are there?and what is different of them?
Difference between control junction box (cjb) and power junction box(pjb)?