find missing no 5 12 23 30 17 8 ? 3

Answer Posted / sakthi muthukrishnan

12

Is This Answer Correct ?    39 Yes 15 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

There are 6561 cricket balls out of them 1 is heavy. Find the minimum no. of times the cricket balls have to be weighed for finding out the heavy ball.

723


A student is ranked 13th from right and 8th from left. How many students are there in totality ?

878


Find the next series: SE QU EN TI ?

858


In a two-dimensional array, X (9, 7), with each element occupying 4 bytes of memory, with the address of the first element X (1, 1) is 3000, find the address of X (8, 5).

908


why we will appoint you.

1804






The average score of a cricketer for 13 matches is 42 runs. If his average score for the first 5 matches is 54, then what was his average score (in runs) for last 8 matches?

845


Find the next number in the series 1, 3 ,7 ,13 ,21 ,31?

729


Gaurav buys milk at Rs. 60 per litre, adds water to it and then sells it at Rs. 75 per litre. What should be the ratio of milk to water to get a profit of 37.5%?

699


find then next series number 5,6,7,8,10,11,14,..?

705


Find the next series: AA AB BC CE ?

845


1,2,3,4,5,6,7,8,9 station. route between any 2 station is there only if the 2 digit nob. is divisible by 3. e.g. route exist between 1 to 2 because 12 is divisible by 3 how many station have routes to 8 either direct or indirect

749


In a fraction, if 1 is added to both the numerator at the denominator, the fraction becomes 1/2. If numerator subtracted from the denominator, the fraction becomes 3/4. Find the fraction.

727


if a man reduces the selling price of a fan from 400 to 380 his loss increases by 20% .cost price of fan is.

873


If a man can swim downstream at 6kmph and upstream at 2kmph, his speed in still water is: It takes 30 days to fill a laboratory dish with bacteria. If the size of the bactiria doubles each day, how long did it take for the bactiria to fill one half of dish?

937


2 persons can finish a job in 8 days. First person alone can finish the work in 24 days. How many days does the second person take to finish the job?

1099