Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the purpose of Panel Groups?

Answer Posted / kcsyam

Panel Groups is an Object on AS/400 (*PNLGRP)
CRTPNLGRP = to create a panel group program
For Help screen using Panel Group
On AS/400 all help screens used Panel Group objects

Is This Answer Correct ?    5 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is program status data structure?

2368


How to call one program from another program in RPG? please help me with the code

1707


What is the diff bw PF/LF Name and their Record format name? what is restriction in record format then file name?

2977


What is difference between bind by copy and bind by reference?

2453


what is an online rpg?

1243


what is a rpg?

1172


what is file information data structure?

2167


what is *place and *auto keyword in prtf ?plz explain

3143


how do I preserve and clean the array?

1130


Hi Viewers can any body explain me how to update and ahange the already existed data in physical file using subfile ? please explain me with the code if possible?

5115


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

2242


Interviewer asked me write down DDS for load all subfile .can anybody write dds

1705


what is the necessary keyword needed to scroll subfile records?

1137


give an eg of ACQ-(ACQUIRE),BIT OFF,BIT ON,DEALLOC,DUMP,FEOD,FORCE,MHHZO,MHLZO,MHLLZO,MLHZO,REL,RESET,TESTZ,TESTB,TESTN----GIVE SMALL EXAMPLE TO THE OPCODES...TO UNDERSTAND FUNCTIONING...........

3811


How would display prime numbers using CL program?

6297