DG B-check,C-Check,D-check is depending upon the running
hrs.If the running hrs is not reached as mentioned.How to
conduct the DG checks.
Answer Posted / omprakash
B. CHECK 250 HRS OR 6 MONTHS
C. CHECK 1000 HRS OR 1 YEAR
D. CHECK 1500 HRS OR 2YEARS
| Is This Answer Correct ? | 90 Yes | 26 No |
Post New Answer View All Answers
can we choose current transformer secondary, to calculate residual flux in a power transformer, so as its saturation is close to the saturation level of power transformer?
does a DG set has low fault level as compared to that of a transformer.If yes then why.
hello friends..... any one have papers or any study materials?sail ,hpcl...?
How to calculate MCB Breaking capacity.
A well system is when , no. of bus bar is less or more. Tell me the concept of it.
What are the Return ( Monthly / quarterly/ Annual submitted to Electical Inspector for an establishment (Factory in Maharashtra-- Small scale category having seperate HT line of 22KV ) as per Maharashtra Electricity Act
difference between crane drive and line drive.
A 1F capacitor is charged to 100V initially. A 1H inductor is connected accros the capacitor througha a switch. The current in the circiut when the switch is closed is____
Convert a star connected network into a delta connected network.
how generator load test is conducted?what are the steps?
How does cost of generation from hydropower plant compare with other sources of electricity?
What is the function of electron gun used in crt?
what is the effect of connecting three phase supply lines to three phase auto transformer output terminals through a fuse of 10Amp and a circuit breaker (MCB). Is this connection permanently destroy the transformer?
A powerplant has 8 gensets operating in grid parallel mode. In one genset sometimes there is pf variation and kvar variation. The plant operates in pf mode. When this variation is observed the load is stable, voltage is also stable, freq and genset speed is also stable. How will you check the functioning of pf card. What shall be the ideal output vdc of the pfc, from there it is input to AVR?
Explain how you intend to work under pressure to meet up with deadline target?