DG B-check,C-Check,D-check is depending upon the running
hrs.If the running hrs is not reached as mentioned.How to
conduct the DG checks.
Answer Posted / omprakash
B. CHECK 250 HRS OR 6 MONTHS
C. CHECK 1000 HRS OR 1 YEAR
D. CHECK 1500 HRS OR 2YEARS
Is This Answer Correct ? | 90 Yes | 26 No |
Post New Answer View All Answers
hi, i have 3x200KVA and 2 x 80KVA UPS with battery bank of 150AH 68Nos. and 100AH 204Nos., i need to install AC either ductable or PAC type, so can you help me to calculate heat load and capacity of the AC to install.
No load tap changing transformer working
what irequirment need to be followed when working on live equipment
how to select overload-relay for perticular motor 1.for D.O.L. starter 2. for Star-delta starter ????
How does HT work & Voltage required?
dear sir/madam i want to get some knowledge about RRB EXAMINATION(section engineer) 1- what is minimum cut off 2- wht portion is major portion . 3- can any body provide Sample paper. thanks & regards ashish
draw vector diagram and +ve,zero sequence diagram of symmetrical three phase fault.
Can we use a absolute encoder to show rpm of a motor ? what about the condition when power is off ? what is difference if a incremental one is used ?abanirout@gmail.com
what is the meaning of 0.5ohm Resistance
Mention the disadvantages of low power factor? How can it be improved?
How many types of colling system it trformers?
is there any device that works properly accept relay, it may be fuse but if i want fuse of 33kv 300 amp it is avaliable, pls give me details
I Have 3 Phase 10 KW AC Alternator i found one phase weak, so what will be the reason & what action shouls i take to rectify the same.
What do you mean by reach and reach the point of the relay?
what is differnce btwen lll and lllg faults