Can anybody tell me, does CL/400 handle LEVEL check while
running the CL program....?
plz share your experience...
Answer Posted / sankar prosad mohanta
you can't capture the Level check error (39) in running
program. Because you know that is file level error and your
program is already using this file. So you need to compile
the file with current source and recompile the CL program
and run it again.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How to write record if no field or the field are different in physical file in rpgle ?
what is *place and *auto keyword in prtf ?plz explain
How to select highest score of each subject or how to select highest income of every month?
How can we know running job is batch or interactive?
1. What is bound-by-call and bound-by-reference? 2. Where and why is *Nomain used? 3. What are the difficulties faced by programmers when using service programs? 4. Explain the different ways of parsing and compiling XML in iSeries.
do you use message subfiles? What are the necessary keywords required coding a message subfile?
how do you use commitment control in rpg?
what are the key words you must use when using a subfile?
which program rpg or cl is efficent to update a transaction onto a database file and why ?
is this a rpg channel?
what is a rpg?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
what is program status data structure?
explain sflclr, sflend, sfldlt, and sflcsrrrn?
How many program bind in one module....