What are the environmental settings for data stage,while
working on parellel jobs?
Answer Posted / vijay
Hi Vijay here
Mainly we need 3 Environment variable to run datastage px
job. They are 1. APT_CONFIG_FILE
2. APT_RECORD_COUNT
3. APT_DUMP_SCORE
Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
Define Data Stage?
Differentiate between data file and descriptor file?
Have you have ever worked in unix environment and why it is useful in datastage?
Explain the datastage parallel extender (px) or enterprise edition (ee)?
how do u catch bad rows from OCI stage? And what CLI stands for?
Why we use surrogate key?
Why do we use exception activity in Datastage?
create a job that splits the data in the Jobs.txt file into
four output files. You will direct the data to the
different output files using constraints. • Job name:
JobLevels
• Source file: Jobs.txt
• Target file 1: LowLevelJobs.txt
− min_lvl between 0 and 25 inclusive.
− Same column types and headings as Jobs.txt.
− Include column names in the first line of the output file.
− Job description column should be preceded by the
string “Job
Title:” and embedded within square brackets. For example, if
the job description is “Designer”, the derived value
is: “Job
Title: [Designer]”.
• Target file 2: MidLevelJobs.txt
− min_lvl between 26 and 100 inclusive.
− Same format and derivations as Target file 1.
• Target file 3: HighLevelJobs.txt
− min_lvl between 101 and 500 inclusive.
− Same format and derivations as Target file 1.
• Rejects file: JobRejects.txt
− min_lvl is out of range, i.e., below 0 or above 500.
− This file has only two columns: job_id and reject_desc.
− reject_desc is a variable-length text field, maximum
length
100. It should contain a string of the form: “Level out of
range:
why do u need the IOS upgradation in a FC switch
What all are the different way to run a job?
What is the importance of the exception activity in datastage?
What are stage variables, derivations and constants?
Can you highlight the main features of ibm infosphere information server?
im new to this tool im now at project plz tell me step by step process how to design plz help me i wnt to go with exp for job plz give me d proper design and explination
Triggers,VIEW,Procedures