DG B-check,C-Check,D-check is depending upon the running
hrs.If the running hrs is not reached as mentioned.How to
conduct the DG checks.
Answer Posted / baskaran.r
the checks are depend on the running hrs. if it is not
reached means engine is not running ok.you can wait till the
running hrs reached. if the stoppage is long you can go
according preservation requirement by the manufacturars
recomendation
| Is This Answer Correct ? | 43 Yes | 15 No |
Post New Answer View All Answers
What is given by the definition in BIL IMP/PF = 950/395 kV. This was found in a name plate of a power transformer.
Who are the manufactures those manufacturing 3Cx2.5sqmm FRLS cables. I heard about FRLS technology adopted only in wires useful for wirings
with help of neat sketch explain principle of TIG welding process
How to calculate cable size by using load.?? Any formula...
we have 3.5MVA-11/6KV transformer. how can we calculate earth fault current and NGR calculation?
Iin ESP why positive is grounded ? why not negative ?
what are the standard IR values should be of R-E, Y-E, B-E, R-Y, Y-B, B-R of VCB in closed condition and in open condition for 500KVA & 1000KVA transformers. and what is the acceptable range when tested by 5000V megger.
Why the dc voltage drop during starting of emergency lube oil pump? The Voltage drop from 135kv to 125 kv for one min. before re-establish to 135kv?
how solar power plant energy meter multiplication factor
what is allowed value of zero sequence impedancce of 6.6 kv nuetral earthing transformer ?what is the actual value
can I improve the furnace power factor (10 mva transformer) by adding a capacitor bank before the transformer.Does system power factor vary a lot with the furnace PF?
how we explain parallel paths armature winding?
where rlc series ckt used?
Why do we need a separate control desk & PLC control panel in Boiler plant or coal handling plant? Can we provide cost effective Control desk cum PLC panel. Is there is an specific need for control desk.. kindly advice.
What is Phase margin?