1)What will you do if main incomer VCB fail in your site ?
Answer Posted / vijay chander
first we informed to respective electricity office and then
find the fault inside the VCB or E.B side. if inside the
VCB means call the person from VCB manufetures.
| Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
what is EIB lighting control system? what is the advantages of this system?
i want to learn control schedule for 11kv panel? can any one send the detailed control schedule?
How to calculate Grid rotor resistance(GRR) losses in slip ring induction motor?
Earth leakage relay basic knowledge principle
what is consequences of neutral and earth connect?
How are load losses and no-load losses measured at site in a DG set?
What are the advantages of autotransformer?
What are the different sign conventions used in electric circuits?
Can a generator runs after getting 1st stator earth fault.
how can you size an automatic voltage regulator?
WHAT WOULD BE THE FORMULA OF WIRE GAUGE FOR A FULL LOAD CURRENT
if 2 coil of 1000W connect in series and 200 v is applied across it . then what is the total power of coil when coil have only resistive load .
A 1F capacitor is charged to 100V initially. A 1H inductor is connected accros the capacitor througha a switch. The current in the circiut when the switch is closed is____
Hello Guys !! i want to rrb section engineer electrical(signal) previous model papers? any body help me?
If anyone would like to know or practice for FEWA papers contact me on mohamedrashad2@hotmail.com Just completed the supervisor exam in April 2021