adspace


What is d diff. btw Online & Offline UPS???

Answer Posted / krish

On line UPS means Supply will come from batteries on line
and charging also on line.
In OFF line UPS supply will come from batteries when main
line supply fails.Batteries will charge on line.

Is This Answer Correct ?    7 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

hi friends i m from electrical branch and seeking for tech. + apti. both papers of hpcl plz get it available as soon as possible

1912


XYZ

2227


please send me last 5 year interview questions

2279


What is the gross weight to copper ratio in slip ring induction motor of 4000 HP,6.6 kv, 372amp, 992 rpm GE motor.

2426


can you please send me the technical questions and aptitude questions of honeywell and jindal steel electrical engg. question paper my e-mail ID is(kkesavanraj@gmail.com)

2063


What will happened if the neutral of the (star connected secondry) Xformer disconnected? (if its Above KVA rated one)

2251


A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.

1186


how to interlock 3 nos MCCBs using under voltage coil. please provide me circuit diagram?

2680


Can you used moeller lzm1 mccb in a dc system with 125vdc and 20ka short circuit current , beside is it have 24 or 48 volt shunt ? Beside how long current can through from An MCB shunt contacts? (like Z7-AS 24 V)?

2153


Is there a standard depth of gravel fill in Substation Switchyard? Please give a design/drawing. Thank you.

5494


Please nybody say, weather the result of Bharat Oman is declared or not? Probable date of declare???????

2094


sir& friends i want the collection of recent quetions asked in interview of top most companies please send me on my email san.jsr@hotmail.com

1878


Dear All we are having a problem in G120 BOP showing alarm A0503, F0052, F0060 we can not remove fault alarm ,Please any body help us. kowsar

1967


Draw a SLD for main panel for school having connected load of 1200kw and emergency generator 200kw.also show the increase of additional load of chiller 225kw in the lv panel indicating meter postion size of transformer ,cables and capacitor bank.

1055


hi this is hema, r there any books in particular for the preparation of the APPSC-A.E.E(electrical), if so please mail me the names ... thank u .

2001