The FM-200 Fire Suppression System is an engineered system
utilizing
a fixed nozzle agent distribution network. The system is
designed
and installed in accordance with the National Fire
Protection
Association (NFPA) Standard 2001, “Clean Agent Fire
Extinguishing
Systems.” When properly designed, the FM-200 system will
suppress
surface burning fire in Class A, B, and C hazards.
Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
what is difference between line differential and transformer differential?
how to convert lv line to hv line and viseversa, any losses will occur during this process
is there any chart showing the suitable cable size according to AMP and length ? for three phase motors
What is the difference between a Root Locus plot and a Bode plot?
what is the difference between elcb and rccb ?
For a 6.6kV Motor it is recommended to do megger test with 500 V d.c and not more than 5kV d.c but the Hi voltage withstand test should be performed by 12kV AC. Why the dc voltage test should be limited but AC voltage withstand test could be with such a high voltage?
Details about Flux Compensated magnetic Amplifer starter for motors
Explain about how is it working Earth fault'relay and wahts the resistance value of earth bed
i have install 750 kva distribution transformer at my site and want to do neutral earthing. what calculations should i follow to determine earthing conductor material and size?
Mention how NPN and PNP transistor works?
If rotor works in clock wise what happens
from which subjects most of the technical que will b asked for hpcl(electrical).pls help me
how many types are their in switchyard or substation(like D,I TYPE), what is differant between them
Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.
How to know Resistance and Reactance value of main and aux winding of single phase capacitor start capacitor run induction motor to find capacitor value?