Answer Posted / suhana_t
The FM-200 Fire Suppression System is an engineered system
utilizing
a fixed nozzle agent distribution network. The system is
designed
and installed in accordance with the National Fire
Protection
Association (NFPA) Standard 2001, “Clean Agent Fire
Extinguishing
Systems.” When properly designed, the FM-200 system will
suppress
surface burning fire in Class A, B, and C hazards.
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
What is Harmonics how it is produced and what is the method to control the same
how to calculate the earth fault current
What will be advantage if we put some load in neutral of grounded star transformer & loadshortcircuit current,rated current of cable & MCB with example?
What can you contribute to the progress of our Company as an employee if you are selected?
What is the effect of solar radiation on the design of an Isolated Phase Busduct?
in 132kv substation CRT means
What is the use of bundle conductors?
if negative of DC supply used and positive is grounded through EGB, and if ELCB used in the system then is it sense the positive volatge and get tripped is it possible?
what is the difference between "Rotary bypass isolation switch and Normal bypass switch" pls share indepth techs?
any one please tell taht what type questions will be asked in BHEL interview, i am having interview on 24th Dec, please send this to mail pradeepsistam@yahoo.co.in
What is accuracy of a measurement?
why EMF IS INDUCED IN A CONDUCTOR WHEN FLUX LINKING WITH IT CHANGES ACCORDING TO FARADAYS LAW.
Why efficiency of generator is higher than motor at a particular load?
This is reqd for a 1MW Solar power plant..We have 2DC outputs from the solar panels Connected to 2INVERTOR panels.. Output from invertor is 3ph,280v,500kva,50hz.These are connected to individual ACB.This has to be stepped up to 11KV ,1250KVA SYSTEM.Now can I use (1) one more ACBTO GIVE A COMBINED OUTPUT OF 1000KVA,280V & STEP UP THE OUTPUT BY USING a single two winding 3 ph transformer 11kv/1250kva. or (2)use the two outputs and connect to one three winding transformer of above rating..Pls suggestwith details.
block diagram of 2 ups system connected in hot stand by mode?