my scenario is repetitive manufacturing (REM) make-to-stock
(MTS)production for sugar industry. What are the things, I
have to customize for this scenario, to the PP point of
view..
Answer Posted / jinchandra
First of all make PP master data,before that create your
orgnisation structure,
After that go as bellow,
In material master view SELECT REM ALLOWED,
IN CUSTOMIZING [OPP3] SELECT THE REM PROFILE,
AGAIN IN MRP4 VIEW CREAT PRODUCTION VERSION BY USING TRSN
CODE C221.
CARRY OUT BATCH MANAGEMENT ,BATCH ASSIGNMENT, PP-PI SHEET,
MASTER RECEIPE,
go for product cost collector KKF6N,
Is This Answer Correct ? | 5 Yes | 4 No |
Post New Answer View All Answers
Mention what is the t-code for changing production order and to display production order?
What are all the ‘technical types of bom’?
Difference between standard cost and variable cost.
What do we do in realization phase?
what do you mean by planning time horizon
Explain what happens to plan after it has been converted into production order?
Differentiate ‘variant bom’ from ‘multiple bom’?
Scheduling times can be defined in the material master record by?
Explain Availability check.
What is group bom?
What is the difference between the fixing type 1, 2, 3, 4?
What is Material status and which view of the material master it is available?
What is the use of mrp group?
What is Inspection Points?
What are the keyfields found in mrp view 1?