DG B-check,C-Check,D-check is depending upon the running
hrs.If the running hrs is not reached as mentioned.How to
conduct the DG checks.
Answer Posted / neeraj
DG check can also be done after completion of period like 3
months 6 month and 12 months
Is This Answer Correct ? | 71 Yes | 23 No |
Post New Answer View All Answers
how to measure the transformer resistance values(dyn11)?and howmuch the minimum value?
May I know how much values to be set for earth fault, over current and short circuit values at 11kv side? I have 11kv van 1250amps rating. Present it's taking load 80amps?
In single phase capacitor motor, if the motor rotate reverse direction then how much power will be consumed by the motor and why?
What is a differential amplifier? Also, explain cmrr.
how to select correct size of power cable for inverter duty motor
In TNC switch, is there any 1NO+1NC block ? and if we move over closing position, is ther any affect on trip position or vice versa?
some time we open engine breaker 8.0 MW load but plant not trip. and another time engine open 4.0 MW load engine trip why? individually engine breaker open & individually emergency stop why difference?
ELECTRICAL ENGINEER TEST IN FEWA ANY ONE HAVE KNOWLEDGE ABOUT THIS?????????
What is the general power consumption rating of CPU CRT type and Flat type, Monitor,Printer, projector, Scanner?
at what base you will tell the direction of rotation of dc motors and generators?
7- What is the Dissipation Factor and the difference between it and Insulation Resistance Test? 8- What is the task (function) of DC and AC reactors in power plant? 9- What is the task (function) of (open delta with earthed) in some types in transformers? 10- What is the base of the selection of the vector group in transformers? 11- What is the zig-zag transformer and its function by drawing in large detail? 12- What is the polarity ? 13- Why we make short between phase(R) in high side and phase (r) in low side in vector group test? Where High Side ( R ,S and T ) and Low Side ( r ,s and t ). 14- What are the time on delay and time off delay? 15- What is the vector group? 15- What is the task (function) of different types of vector group such as Dyn11 , Dd0 , YNd1,……..,?
what are the preventive maintanance actions taken for air circuit breaker? please answer me
why genarator genarating voltage 11 KV?
How to measure size of cable on a given load
please anybody help me to find out the BHEL trainee Exam previous year questions papers . if u ve pls. send it to surekhared@gmail.com