On which server you receive the tickets . After solving
the tickets what you do.How it is send to the client. Do
you do any quality check as such?
Answer Posted / sriram.fico
Tickets will be receiving from Production Server.
Solutions should be depends on client service desk. We
have to give the answers through emails.
If it is configuration change we have to ask Change Request
form from the client. Then we have to do configuration
after that it moves to testing server. Once consultant
checks if there is no error it will be transported to
Quality server, there user has to check and give User
Acceptance testing. Then only the requests move to
production server.
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
Where do you assign activity type in cost centers? : co- cost center accounting
What do you mean by low value assets? : fi- asset accounting
what is the configuration steps of letter of credit?
How can you manually clear open items? When? : fi- general ledger accounting
What do you understand by variance calculation in period end closing? : cost center accounting
Hi I'm looking for two SAP Project Manager (one specialized in MM/PP, one in FI) for Automotive, based in Compiègne (Oise, France). Should somebody give me an idea to find these persons ? thanks a lot !
What is an asset class catalog? : fi- asset accounting
Hi What is a STAGING CLIENT in our Land scape? a bit of confusion in this
What controls the screen flow?
What do you mean by chart of accounts? What is it used for?
What do you understand by a line item? : cost center accounting
Is there an easy way to maintain exchange rates in sap?
What is a screen layout? : fi- general ledger master data
what is the company fixed ovh and shop fixed ovh ? bikash 9931538682
What is the difference between olap and data mining?