how to change job priority when it is running in sub
system ?
Answer Posted / siva
There is no command such as "CHGJOBPTY". we can change the
priority of the job using the command "WRKACTJOB" take
display option on the specified job which u need to change,
and take option 40.Change job to change the job priority.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What Is The Difference Between Goto & Exsr?
Difference Between Call & Sbmjob?
WHAT is STORED PROCEDURE CONCEPT IN AS400 WITH EXAMPLE?
what is procedure prototype and procedure interface.
an access path may be in which sequence?
what would be the effect on the field where reverse image, underline and highlight display attributes are active ?
what are the different types of data areas?
difference between sflrcdnbr and sflnxtchg?
How can we update a specific field in RPG?
what is the sequence when using cursor?
how you will know whether you are in sfldrop or sflfold mode?
a multiple format logical file is also known as?
what is *iso date format?
what is a physical file?
what is the maximum number of files allowed in rpg?