Answer Posted / peeyoosh jain
Before the project goes live, consultants normally create
various cycles in the system for required business
processes, test it and document the steps required to
complete the entire cycle and get the desired results.
Such a document is known as end-user training Document
which is created in specific templates.
It is very essential for the success of any project that
the master data maintenance and steps for carrying out the
transactions be explained to the users of the system. This
is done through formal training programs known as End-User
trainings.
| Is This Answer Correct ? | 27 Yes | 1 No |
Post New Answer View All Answers
How to change chart of accounts of company code after making several sales orders and delivery?
When you create a credit memo request do you always have to refer to a sales order or any other previous document?
What do you do really in pricing determination, and what are the main differences between one pricing procedure determination to the others, which data control these differences?
What is the client no of SAND BOX.GOLDEN CLIENT, UNIT TESTING,ENDUSER TRAINNING AND PRODUCTION SERVER?????
Describe the shipping process for a cosignment of cargo loaded in continental Europe
PRICING…… I have a requirement where I have a fright condition which is a header condition for the whole document, I will be maintaining the fright condition recorder (header level) because it’s header condition, now the requirement is if I want to have 5 conditions to be calculated for each item because let’s say I have 5 line items, I want to see how the side calculated first of each item so what’s the best way to take out that out of the system in standard configuration, how can we achieve this?..... REPEATING question (I have a fright condition, now fright condition is a header condition, now my requirement is I wanted to applied that fright condition each line item level so fright condition applies a header level but my requirement is I want to see each and every line item should also get this fright condition on the value of the item, let’s say my fright is $100 so I have 5 line item, each item has the 10 10 10… so build on that value I want to purpurnate the fright condition, how can we achieve this from the standard system configuration stand point?
Can you split deliveries into several invoices? When would you do that?
Hi, wrong work item in universal work list.what could be the reason and where to check? can any body guide me thanks
Name at least five features that you can control for the schedule line category? Relevance for delivery, availability check, transfer of requirements, goods movement, purchasing and incompletion log.
What is a partner type? Give some example?
I have created value contract with order type WK1 in VA41. The target value is 500 USD and the net price is 1000 USD. There was no pop up message or error thrown while saving the contract when the net price exceeded the target value. And the system allowed to save the contract. Is there any configuration available to activate the warning or error message or any enhancement need to be done?
Can you configure two diff free goods items for one single item?
Does sap transportation management have load planning capabilities? : transportation management
Explain sales document blocking?
Define condition types?