How I can reread the physical file in CL program once the
end of file reached in same CL program.
Answer Posted / sri
Hi Jim can we declare two files in a CL program?
| Is This Answer Correct ? | 12 Yes | 3 No |
Post New Answer View All Answers
how do I declare a table or array in rpg iv?
1. If there are two programs using same file and 2 users are using the file at the same time and what can be done to allow them both to access? 2. How can remove lock from the file for accessing it by both users?
If my rpg program has a date field, what extra care I have to take while compiling that rpg program? If the file is keyed and I have declared the file as well as key list properly in my program. Still am getting an error message like "chain/reade operation is not allowed" what may be the case?
Assume 2 users are using the same file and first user updates some record in the file. Will the 2nd user will be able to see the updated record or not?
What is the difference between copybooks and subprocedures in as400?
how can you display specific subfile page on the screen in unequal subfile?
can I touch the array during treatments?
What is the difference between iter and do?
What is the diff bw PF/LF Name and their Record format name? what is restriction in record format then file name?
are there any useful c runtime apis that I can call from rpg iv?
what is file information data structure?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
explain sflclr, sflend, sfldlt, and sflcsrrrn?
what is the use of sflnxtchg?
which program rpg or cl is efficent to update a transaction onto a database file and why ?