What is interaction or interface bet PP with FICO and PP with SD
Answer Posted / manish
costcenter,sales order
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
What is planned consumption and unplanned consumption?
Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.
What is the uses of production scheduling profile and what the configure have you done current project
What is golive actually? What is the role of a functional consultant in golive actually?
Explain Availability check.
What is Backflush, the places where the backflush is used?
How you get the ticket?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
What is costing? How it is affected the pp?
what do you mean by planning time horizon
What is the use of mrp list?
What is the need of mrp list if the stock requirement list is already given?
When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP
What are the three 'mrp procedures'?
Overlapping and splitting, where do you assign?