Answer Posted / kumar
because ht motor starting current always high so that
motor connection should be star to delta for limiting the
starting current.the principle is that staring position
motor connection in star later it change to delta
Is This Answer Correct ? | 19 Yes | 20 No |
Post New Answer View All Answers
how can we calculate the ampacity of the electrical wire/cable. and what are the factors must be considered. pls. elaborate.
What is the loss of transformer of 220kv/11kv, 63/80 MVA and 18.05% impedance
We have 110Vac ,10A ac supply which is converted into 110VDC & How much DC current? which factor is reqired for dc current calulation?
When distance between two pulleys is not fixed, the tension of belt is adjusted by a) driver shaft b) driven shaft c) adjustment screw d) belt
Different types of relay fault which phase sequence??
how the CT and PT is connected in the circuit during testing of transformer explain with diagram
How to choose the vector group for the step up and step down transformers??? Tell me the which vector group is suitable for step up and step down transformers and whats the reason to choose and whats the benefits???
what is diff. between earthing grid,earthing mess, earting grid?
when the time of backcharging the transformer three phases only enough or three phase with neutral is must.from these which one is the best one.
How would you relate your key competencies to this position?
In a flange coupling, the flange bolts are designed for
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)
draw 3 phase rectifier diagram
in control scheme dc logic wiring commonly using negative loop,what is the reason?if we use positive looping what will happen?
why we permissive overreach in distance protection.where it is applicable to use in long r short lines