Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

WHAT IS THE DIFFERENCE BETWEEN SHOP DRAWINGS/ DESIGN
DRAWINGS AND AS BUILT DRAWINGS??

Answer Posted / prashant

When we are qouting for a project its on the basis of
TENDER DWG
After that we start prepearing the SHOP DWG ie for use at
site and as per this dwg work has to be executed at site
Finally we have to prepare the AS BUILT DWG ie the exact
dwgs as to how the work was carried out at site bcoz at
site due to the site conditions the site engg mite have
laid the wire or the conduits thru a diif path as shown in
the shop dwg. All such deviations are to be shown in the AS
BUILT DWG

Is This Answer Correct ?    53 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Draw the vector diagramme for Asynchronous Induction Generator at noload,half load and fullload.

1920


WHAT IS SITTING AMPS IN OVER-LOAD RELAY FOR 1PH OR 3PH MOTORS?IF ITS NAME PLATE GIVEN MAX AMPS 10AMPS?

1699


What happen if we apply square wave or traiangular waveform voltage to the transformer primary winding instead of sinusoidal wave?

2112


why do we not use equivalent voltage source in negative sequence equivalent ckt.

1995


What is warm / cold start of HT motors. How many warm start & cold start are possible in a day?

1999


how to test YNyn0 vector group in transformer?

3803


What is reactive power and where it is used.

1645


What is the de rating factor of cable? What is the importance of the de rating factor in cable selection?

2033


Is it possible to operate a synchronous 2-poles turbogenerator with a still-in-place faulted bar but electrically disconnected ???? If yes, should I act on the other phases as well ???

1928


I have made a 3 phase thyristor full bridge rectifier. But at the moment it is working only for the half bridge operation. Both the half bridges are on operation separately but when i put it into full bridge operation the oscilloscope output is zero. I rechecked that the pulses are correct for each thyristor. what could be the possible reason for this?

1888


For a stable system, where should the poles of a system be in a root loci plot?

1178


1.25 kg of hydrogen are burnt with stiochiometric air, the mass of air in kg required is

2052


what is difference between earthingpits,earthing grid & earthing mess?

2445


i want to model paper for section engg.

1960


Why earthing is necessary for any equipment?

1652