Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is AMF panel????????

Answer Posted / madmax

AMF actually means " automated mains failure " this term is
normally used in conjunction with generators. normally when
there is a power failure the AMF relay detects it and
activates the generator within a stipulated time ( say 2
min ). Normally the generator control panel will be housing
the AMF relays.

Is This Answer Correct ?    162 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

PLEASE ANYBODY HAVE ELECTRICAL CIRCUIT DIAGRAM FOR CHMER PULSE CD 60M SPARKING MACHINE.PLEASE MAIL ME SUPRIYAAYYAPPAN@YAHOO.CO.IN.

2746


Incoming line 11kv And transformer capacity is 2500kva. Consumption load is 1300A. Then fuse capacity is 11kv line.

1627


with help of neat sketch explain principle of TIG welding process

1904


what is the safety of voltage power transformer(2250KVA0

1930


In HI POT test what is reason for applying the AC VOLTS and DC VOLTS in different applications what is the nessesity for this ?

1881


how much GROUND & NEUTRAL VOLT maintain in data center.

1988


what is calculation mathod/formaulla for deciding Size of busbar (Copper/ aluminum)for L.T. panel on Various Fault level like 50kA,25kA,10kA

2741


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

1987


How to select the earthing transformer,for DELTA TO DELTA TRANSFORMER OR ALTERNATOR SIDE.Pls post your answers and calculation.

2320


How many types of faults are there in 3 phase power system?

1025


How to calculate the heat load for a electrical room

3018


what is the function of capacitor duty contactor in an capacitor panel???

4092


how many single tension hardware are required on a double circuit transmission tower?

1869


How to calculate impedance volt in Transformer?

2039


how to determine ct ratio in ht vcb?

1773