Types of sub station:
1)Pole mounted type sub station
(for low rating up to 100 kvA)
2)Outdoar type sub station
(for voltage upto 11kv to 132kv)
3)Indoar type sub station
(for voltage local sub station primary voltage
11kv,secondary voltage 400/440 volts)
Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
In india, according to trade theory above 5 HP motor reqired star delta starter. But we R connect 11 KV motor with 14MW in Direct to line ( With VCB starter combination) Can U Guess, How it is possible ?????
what is an unbalance in acircuit? in a three phase 3wire circuit how an unbalance will come? in a three phase four wire system how an un balance is coming?
As we use capacitor bank in 3ph ckt to improve PF, can we use capacitor in single ph domestric use, in house we have Fan,Mixer,electric cooker,iron,tube choke they also lag the system,because it is inductive load. if it is possible to improve PF of single ph system-- if yes- type of capacitor to be used,connection diagram, working in detail. if no-- list it.
we have earthmat at 110KV substation.we would like to take earth resistance.b some says that by connecting earth megger terminals (C1,P1) at middile point of earthmat (at riser) will cause voltage gradient at other earthmat nods and dont get exat earth resistance.when connecting at end nods will get exat value . is it correct .please explain
from where the self excitrd induction generator get the power?why is the voltage regulation is poor of seig?
when we design electrical schemes of 11/.415kv distribution..wen and were should we show the relays??what is the function of it?for example..we place EFR Relay CT between transformer neutral link and transformer earth.Like this what are the other type of relays we should use?why?where?Explain please..Thank you
If not into production, how far did you follow the design and why did not you see it into production?
Why transformer used in UPS??
How calculated single phase induction motor req. Capacitor?
What are the weight of 800KV DA,DB and DC type tower ?
sir pls tell me . our ct specifications are 120/5 ,2 core , 0.2 and 5p10 class , 30va and 30va buden. insted of 30 va i want use 15 va. can i use?
how to wiring it with contactor and timer together
What mean by MLTP
Can we check ELCB constantly from R1 to R8 phase in 1 no DB?
why we use condenser in the thermal power plant, althrough the same vapour will be again heated