Can anybody tell me, does CL/400 handle LEVEL check while
running the CL program....?
plz share your experience...
Answer Posted /
it is just like rpg/400 but there are some more cases of level
check error -when we override DBF which have different DS
then ur pgm give level check error-try it
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
how do I declare a minor?
can I touch the array during treatments?
1. What is bound-by-call and bound-by-reference? 2. Where and why is *Nomain used? 3. What are the difficulties faced by programmers when using service programs? 4. Explain the different ways of parsing and compiling XML in iSeries.
1. If there are two programs using same file and 2 users are using the file at the same time and what can be done to allow them both to access? 2. How can remove lock from the file for accessing it by both users?
how do I play {insert rpg system here}?
what is kids-rpg?
what is file information data structure?
Set on command is used for closed all opened files , initialize var and release resource , return cmd is used for return to calling program but my req. Is dnt close opened files and resource must released while doing transactions , how can i do this...?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
Explain mdt?
what is *place and *auto keyword in prtf ?plz explain
is this a rpg channel?
How many program bind in one module....
How Chain operation copies the record's data to the input buffer for the program?
How to create a login screen using a command instead of display file.... intention is to get a password field on a command..... how do you achieve this...